Energy potential analysis for the Grand Hotel Heiligendamm

The Kempinski Hotel Heiligendamm is a 5-star established that opened in 2003. In light of the hotel’s very high operating costs, we were tasked with identifying savings potential to improve the energy parameters, especially with regard to technical operations.

Project
5-star category, Kempinski Grand Hotel, Heiligendamm
Services
Overall analysis of the facility management, determination of the optimisation potential, preparation of an expert opinion on energy savings.
Owner
Techem Energy Contracting GmbH Kempinski AG
Architects
Kempinski AG
Facts and figures
Gross floor area:34.400 m²
Hotel rooms:118
Hotel suites:107
Project time frame:2008

Address:

Grand Hotel Heiligendamm
Prof.-Dr.-Vogel-Straße 6
18209 Bad Doberan, Deutschland

  • Bird’s eye view

  • Panorama

     

Further reference projects

  • Special buildings and museums Private: Hotel AdlonMore
  • Special buildings and museums Sports hall for the German Armed Forces BerlinMore
  • Special buildings and museums Tornower Weg day care centreMore
  • Special buildings and museums Scharoun Theater WolfsburgMore
  • Special buildings and museums Fischerinsel indoor swimming pool BerlinMore
  • Special buildings and museums BIP-Creativity Primary School Berlin-WeißenseeMore
  • Special buildings and museums Private: Botanical Gardens, Berlin-DahlemMore
  • Private: Spandau Citadel 
BerlinMore
  • Special buildings and museums Königshorster Straße 
day care centreMore
  • Private: Reichstag President’s Palace 
BerlinMore
  • Special buildings and museums Private: SPRUNG.RAUM 
Berlin-MarienfeldeMore